Bridges & walkways. fabricated for the real world.
GREATBRIDGE fabricates and installs steel bridges, footbridges, walkways and access structures for infrastructure, civil engineering, industrial and waterside projects across the UK.
What GREATBRIDGE delivers
Bridge, footbridge & walkway fabrication.
From fabrication and trial assembly through inspection, coatings, delivery and site erection, we coordinate the package around the demands of the final installation.
Transport, lifting, temporary stability and installation methodology are considered alongside fabrication so the completed package is ready for the realities of site.
- Pedestrian bridges and footbridges
- Steel walkways and access bridges
- Truss structures
- Industrial access structures
- Platforms and stairs
- Heavy fabricated bridge components
- Trial and pre-assembly where practical
- Protective finishes
- Delivery and site installation
Built before it reaches site
Trial fit where it adds certainty.
Trial fitting and pre-assembly are used where practical to prove interfaces, geometry and handling before delivery.
This can reduce avoidable site issues and helps the project team plan transport, lifting and final connections around the real assembly.
Fabrication and coatings connected
One route through the workshop.
Inspection, structural steel painting and protective coating requirements are coordinated with fabrication and release.
Explore industrial coatings →From workshop to final position
Planned around installation.
Delivery planning, lifting, sequencing, interface coordination, erection and site welding where required are considered before the completed steelwork leaves the facility.
Explore site installation →Start a conversation
Let's build something substantial.
Drawings, specification or simply an outline — send us what you have and we'll help establish the right route forward.